Heartland
master brummie
The date for the anticipated replacement for the footbridge is now set for October 2018, with work extending into 2019. Temporary bridges will be put into place whilst the alterations progress.
The present footbridge was erected for the station alterations made at the time of electrification. The station buildings now in place took the place of the fire damaged buildings on the bridge.
The decking of the present footbridge had to be replaced through corrosion when access to the up platforms was made from the road bridge.
The December update is that the revised schedule is in 2019 !
The present footbridge was erected for the station alterations made at the time of electrification. The station buildings now in place took the place of the fire damaged buildings on the bridge.
The decking of the present footbridge had to be replaced through corrosion when access to the up platforms was made from the road bridge.
The December update is that the revised schedule is in 2019 !
Last edited: