• Welcome to this forum . We are a worldwide group with a common interest in Birmingham and its history. While here, please follow a few simple rules. We ask that you respect other members, thank those who have helped you and please keep your contributions on-topic with the thread.

    We do hope you enjoy your visit. BHF Admin Team
  • HI folks the server that hosts the site completely died including the Hdd's and backups.
    Luckily i create an offsite backup once a week! this has now been restored so we have lost a few days posts.
    im still fixing things at the moment so bear with me and im still working on all images 90% are fine the others im working on now
    we are now using a backup solution

Bsa Factory In Blitz

As for picture 4 have seen this loads of times and cannot place it anywhere in the factory. Lived down Armoury Rd and went all over the factory during demolition ( and before but that’s another story lol )
 
This is a very interesting document Captblack! Thanks for sharing! I can indeed imagine that the places where the bombs fell are more accurate in this document than on the bomb census map. Added benefit: the exact dates when the bombs fell. Will have to check and compare a few things now! :)

As for the picture in #4: I am more and more convinced that this picture must have been taken elsewhere...

Cheers,
Jan
 
OK, so this were the bombs that fell on the BSA factory according to the "official" bomb census map:

dots 3.png

But according to Captblack's excellent document, it looks more like this:
(I'm just a bit unsure about which bombs were HE and which were incendiary bombs)

dates.png
Schermafbeelding 2017-11-06 om 18.37.55.png

Interesting to see that the "new factory building" was bombed in the opposite corner of what everybody was thinking! And indeed, the factory was hit during three raids within three months: August 26th 1940, November 19th 1940 and November 22nd 1940.

Jan
 
I've also checked the ledgers with the BSAM20 production again, and have come to this conclusion:

After the August 26th raid the production of the M20 wasn't interrupted or delayed.

This is the daily production before and after the November air raids:
1/11: 82
2/11: 49
3/11: none (Sunday)
4/11: 65
5/11: 85
6/11: 81
7/11: 82
8/11: 89
9/11: 39
10/11: none (Sunday)
11/11: 59
12/11: 59
13/11: 92
14/11: 87
15/11: 80
16/11: 50
17/11: none (Sunday)
18/11: 57
19/11: 67
20/11: 33 (this is just after the air raid of 19/11)
21/11: none
22/11: 20

From November 23rd 1940 onwards (this is just after the air raid of 22/11) the production was delayed until December 22nd 1940:

22/12: 6
23/12: none
24/12: 24
25/12: none (Christmas)
26/12: 49
27/12: 23
28/12: 53
29/12: none (Sunday)
30/12: 46
31/12: 58
1/1/1941: 24 (New Year)
2/1: 50
3/1: 46
4/1: 36
5/1: none (Sunday)
6/1: 50
7/1: 47
8/1: 52
9/1: 50
10/1: 57
etc...

The November air raids clearly had an effect on the production: not only had the production been delayed by a month, but the average production of 70 motorcycles per day had dropped to an average of only 35 bikes per day when the production resumed in late December 1940 - early January 1941. Also interesting to see that production continued on New Year's day!

Jan
 
what a mystery this is turning out to be:rolleyes: wherever that photo was taken it caused considerable damage...

lyn
 
You can clearly see where they rebuilt the factory in the 50’s , strange that they never rebuilt the centre section but just put a corrugated roof over it,
 

Attachments

  • F5BECF5A-EBEB-440A-88A3-48801D09CF22.jpeg
    F5BECF5A-EBEB-440A-88A3-48801D09CF22.jpeg
    99.2 KB · Views: 24
Interesting photographs. The roofing and the bricks of the rebuilt part of the building clearly have a different colour!

Jan
 
Back
Top